Redelux


EV charging infrastructure that earns its keep

AC and DC fast charging hubs with solar canopies, smart load management and revenue-grade metering.

Redelux EV charging hub with solar canopy
The Redelux difference

Utilisation first, headline power ratings second

Most EV charging projects fail on utilisation — chargers sit idle because the location, power rating or pricing model was wrong. We run a utilisation study before recommending anything.

  • Site assessment: footfall, dwell time, fleet composition and grid headroom.
  • OCPP 1.6/2.0 compliant — interoperable with all major CPO networks.
  • Solar canopy option: offset 30–60% of charging energy with on-site generation.
  • Revenue-grade MID-certified metering for EV tariff billing.
Charger types

Right power level for every use case

AC Slow (3.3–22 kW)

Ideal for workplace, hospitality and residential — charges fleet vehicles and employee EVs overnight or during work hours.

DC Fast (30–120 kW)

Retail, logistics and highway hubs where vehicles dwell for 30–90 minutes. Significant revenue potential with smart pricing.

DC Ultra-Fast (150–360 kW)

Trunk road charging plazas and fleet depots where charging time is the primary constraint.

Ready to deploy EV charging at your site?

Tell us about your fleet, your footfall and your grid connection — we'll take it from there.

Start the conversation