Frequently asked questions
Straight answers about cost, timelines, warranties, subsidies and performance.
A typical 500 kWp to 2 MWp rooftop runs 10–16 weeks from signed contract to grid synchronisation, including structural survey, approvals, supply and commissioning.
Most commercial and industrial clients offset 30–60% of annual consumption, with payback between 3.2 and 4.8 years depending on tariff, shading and roof geometry.
Yes. Liaison with the DISCOM, net-metering applications, subsidy documentation and inspection support are included in our EPC scope.
25-year linear performance warranty on modules, 5–12 years on inverters, 10 years on battery systems, and a 5-year workmanship warranty on the balance of plant.
In most cases yes. We audit the inverter topology and switchgear, then propose either an AC-coupled retrofit or a hybrid inverter replacement.
We offer comprehensive AMC tiers with module cleaning, thermographic inspection, string-level analytics, spares and guaranteed response windows.
We run a utilisation study using footfall, dwell time and local grid capacity before recommending charger count and power rating.
Every installation ships with the Redelux Pulse dashboard: live generation, PR, string diagnostics, savings and CO₂ avoided, with monthly PDF reporting.