2.4 MWp

Nova Textiles Rooftop
2.4 MWp captive rooftop, commissioned 3 weeks ahead of schedule.
A snapshot of recent solar, storage and EV charging infrastructure delivered by our teams.

2.4 MWp captive rooftop, commissioned 3 weeks ahead of schedule.

18 MWp open-access solar park with single-axis tracking.

3.2 MWh peak-shaving storage — 34% reduction in maximum demand charges.

24 DC fast chargers across six logistics sites with OCPP network integration.

850 kWp solar canopy over guest parking — combined EV charging provision.

1 MWp solar with 2 MWh storage for critical-load resilience and peak demand management.
Ask us for case studies relevant to your industry, scale and geography.